Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.
| Patient Application |
|
|---|---|
| Application Site |
|
| Lead Set Length |
|
| Shielded |
|
| Number of Leads |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Philips Healthcare Equipment |
|
|---|---|
| Use with Non-Philips Healthcare Equipment |
|
| Product Category |
|
| Product Type |
|
| CE Certified |
|
| Single-Patient Use OR Multi-Patient Use |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Minimum Shelf Life |
|
| Sterile OR Non-Sterile |
|
| Use with Other Supplies |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Use with Philips Healthcare Equipment |
|
|---|---|
| Use with Non-Philips Healthcare Equipment |
|
| Patient Application |
|
|---|---|
| Application Site |
|
| Lead Set Length |
|
| Shielded |
|
| Number of Leads |
|
| Electrode Attachment Method |
|
| Color Coding |
|
| Use with Philips Healthcare Equipment |
|
|---|---|
| Use with Non-Philips Healthcare Equipment |
|
| Product Category |
|
| Product Type |
|
| CE Certified |
|
| Single-Patient Use OR Multi-Patient Use |
|
| Packaging Unit |
|
| Not manufactured with natural rubber latex |
|
| Minimum Shelf Life |
|
| Sterile OR Non-Sterile |
|
| Use with Other Supplies |
|
You are about to visit a Philips global content page
ContinueEz a weboldal kizárólag olyan személyek számára készült, akik mint szakemberek használják az orvostechnikai eszközöket, ideértve az orvosi szakmát gyakorló személyeket, az egészségügyi intézmények képviseletében eljáró magánszemélyeket vagy az orvostechnikai eszközöket szakmai célból vásárlókat.
Ön olyan személy, aki megfelel a fenti kritériumoknak?